Advisor Minutes
Meeting 14 (12/02/20)
Start
3:00 PM
End
3:19 PM
-
Went over the PowerPoint for our presentation, advised us on how to proceed with our presentation for Friday.
Meeting 13 (11/25/20)
Start
3:02 PM
End
4:18 PM
-
Set the time slot for presentation
-
Went over the website
-
Advised to add verifications in the engineering specification table
-
Discussed Success Criteria
-
Discussed Block Diagram
-
Need to update Budget & Timeline on the website
-
Went over the report. Advised to fix the table of contents, lists of figures and tables, add detail to some section headings, and to fix the timeline.
Meeting 12 (11/20/20)
Start
2:45 PM
End
3:45 PM
-
Looked over the website
-
Discussed the progress log
-
Went over the report, advised to change the page numbers, revise figure numbers and table numbers.
Meeting 11 (11/17/20)
Start
2:30 PM
End
3:45 PM
-
Went over success criteria
-
Need to work on progress log
-
Went over report {Check spacing in written report, elaborate on component's role, Revise motivation section and provide clarification}
Meeting 10 (11/13/20)
Start
5:00 PM
End
6:07 PM
-
Went over minutes of meeting, advised to change week numbers to meeting numbers, add dates for meeting, and add more detail to the notes
-
Discussed updating the progress log
-
Discussed components that we purchased and add it to the report
-
Went over the report and advised on revisions
Meeting 9 (11/08/20)
Start
5:20 PM
End
6:18 PM
-
Revise the report
-
Create a success matrix
-
Work on proving system
-
Have most of the report done
Meeting 8 (10/24/20)
Start
9:00 AM
End
9:35 4M
-
Add pictures inside the report
-
Recommended to start drafting chapter 2
-
Discussed the engineering specification table and time and effort table
-
Discussed electronic switch to open and close tent
-
Discussed material used for tent system
Meeting 7 (10/15/20)
Start
4:10 PM
End
5:00 PM
-
Add specifications for motor requirements by providing detail about starting current.
-
Add specification for battery and buck boost converter
-
Add specification for microcontroller to fit the sensor requirements
-
Revise the abstract
-
Add more information to the progress log
-
Start Chapter 1 of report
-
Work on tent prototype
Meeting 6 (10/08/20)
Start
4:00 PM
End
4:36 PM
-
Change font and background of home page and revise the description
-
Revise Progress Log, add detail
-
Start working on Chapter 1 of report
-
Work on showing how the tent deployment works
Meeting 5 (10/01/20)
Start
4:05 PM
End
5:04 PM
-
Add an explanation of block diagram
-
Revise block diagram to reflect the engineering spec table
-
Revise Engineering Spec Table
-
Get a buck boost converter
-
Revise reference page and progress log
-
Project is approved!!!
-
Give the project a name, description, about us
Meeting 4 (09/24/20)
Start
4:03 PM
End
4:50 PM
-
Discussed the tent deployment idea
-
Need to update the block diagram
-
Need to update specification table
-
Create the progress log
-
Need to update time and effort table
Meeting 3 (09/17/20)
Start
5:05 PM
End
6:10 PM
-
Discussed Self Deploying tent idea
-
Do more research on self-deploying tent
-
Do research on AC system powered by solar energy
-
Split the block diagram into different modules
-
Put together project progress log
-
Put together an engineering requirement table
Meeting 2 (09/10/20)
Start
4:03 PM
End
4:57 PM
-
Went over website design and improvements.
-
Elaborate on project ideas.
-
Discussed furthering the drone and hydrogen cell generator idea.
-
Encouraged to think of other ideas to propose.
Meeting 1 (09/03/20)
Start
5:02 PM
End
6:01 PM
-
Discussed Syllabus, website development, and project ideas.
-
Discussed Drone idea with 360 Camera.
-
Discussed self-deployable tent with Hydrogen Cell Power